coltonwynn 06-27-2009 11:36 AM

How long to let dry?
 
How long after the last coat should I let it dry before fishing?

Rip Tide 06-27-2009 11:57 AM

Re: How long to let dry?
 
How long can you stand to wait ?
:frogdance
Just 'till it's dry

coltonwynn 06-27-2009 01:12 PM

Re: How long to let dry?
 
lol I was ready to go before I did the first coat!!!!!

mojo 07-03-2009 10:28 PM

Re: How long to let dry?
 
It's way past it's hardening time, and I'm sure you've already fished it. Read the label of the epoxy. Most are 24- 48 hours. Unless it's Diamondite or U40.

Guest1 08-13-2009 11:57 PM

Re: How long to let dry?
 
I only use lite build flexcoat. It should set for 24 hours before you use it. 2nd coats should be done after 12 hours but before 24 for best results.


All times are GMT -5. The time now is 09:42 PM.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0
2005-2014 The North American Fly Fishing Forum. All rights reserved.