The North American Fly Fishing Forum  
Go Back   The North American Fly Fishing Forum > News and Announcements > News & articles for discussion


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old 03-14-2011, 09:28 AM
fredaevans's Avatar
Senior Member
 
Join Date: Nov 2009
Location: White City (tad north of Medford) Oar-E-Gone
Posts: 3,267
fredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant futurefredaevans has a brilliant future
Exclamation If you build a dam, what you do with water flow is now critical path.

Hungry Horse Dam study: Natural flows in upper Flathead best for native trout
__________________
"We sleep soundly in our beds because rough men stand ready in the night to visit violence on those who would do us harm." – Winston Churchill
Reply With Quote
  #2 (permalink)  
Old 03-14-2011, 10:18 AM
Senior Member
 
Join Date: Dec 2010
Location: Arkansas
Posts: 1,687
littledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond repute
Default Re: If you build a dam, what you do with water flow is now critical path.

That's a good article, thanks for sharing.

Dave
__________________
Power corrupts, absolute power corrupts absolutely.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Let's Build a Rod Together Frank Whiton Fly Rod Building 104 09-27-2011 05:08 AM
How much for a pro build? colotrout General Discussion 14 03-27-2010 10:39 PM
For your review (please be critical) dorian.ducker Share Patterns 14 02-22-2010 10:37 PM
Cimarron River: Water flow below Eagle Nest Lake as of Monday was 4.9 cfs. There were Fish Bones The Daily Papers 0 11-20-2008 12:10 AM
ROSS new Flow reel Frank Whiton General Discussion 3 02-14-2008 03:39 PM













All times are GMT -5. The time now is 02:35 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0
2005-2013 The North American Fly Fishing Forum. All rights reserved.