Thanks Thanks:  0
Likes Likes:  0
Results 1 to 2 of 2
  1. #1
    Join Date
    Nov 2009
    Location
    White City (tad north of Medford) Oar-E-Gone
    Posts
    10,829

    Exclamation If you build a dam, what you do with water flow is now critical path.

    When wealth is lost, nothing is lost; when health is lost, something is lost; when character is lost, all is lost. - Billy Graham"

  2. #2

    Default Re: If you build a dam, what you do with water flow is now critical path.

    That's a good article, thanks for sharing.

    Dave
    I was going fly fishing until my wife suggested it, now I can't tell who is outsmarting who!

    Being "one with nature" requires a knowledge of what animals are living nearby and a weapon of sufficient magnitude to give you at minimum an equal chance of survival. No one has an invisible aura that animals can detect and sense your good intentions.

Similar Threads

  1. Let's Build a Rod Together
    By Frank Whiton in forum Fly Rod Building
    Replies: 108
    Last Post: 05-25-2017, 09:09 PM
  2. How much for a pro build?
    By colotrout in forum General Discussion
    Replies: 14
    Last Post: 03-27-2010, 11:39 PM
  3. For your review (please be critical)
    By dorian.ducker in forum Share Patterns
    Replies: 14
    Last Post: 02-22-2010, 11:37 PM
  4. Replies: 0
    Last Post: 11-20-2008, 01:10 AM
  5. ROSS new Flow reel
    By Frank Whiton in forum General Discussion
    Replies: 3
    Last Post: 02-14-2008, 04:39 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •