The North American Fly Fishing Forum


Go Back   The North American Fly Fishing Forum > >

Thanks Thanks:  0
Likes Likes:  0
Dislikes Dislikes:  0
Reply
 
Thread Tools Display Modes
  #1  
Old 03-14-2011, 09:28 AM
fredaevans's Avatar
fredaevans fredaevans is offline
Senior Member
If you build a dam, what you do with water flow is now critical path.
 
Join Date: Nov 2009
Location: White City (tad north of Medford) Oar-E-Gone
Posts: 10,479
fredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond reputefredaevans has a reputation beyond repute
Exclamation If you build a dam, what you do with water flow is now critical path.

Hungry Horse Dam study: Natural flows in upper Flathead best for native trout
__________________
When wealth is lost, nothing is lost; when health is lost, something is lost; when character is lost, all is lost. - Billy Graham"
Reply With Quote
  #2  
Old 03-14-2011, 10:18 AM
littledavid123 littledavid123 is offline
Senior Member
 
Join Date: Dec 2010
Location: Arkansas
Posts: 2,960
littledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond reputelittledavid123 has a reputation beyond repute
Default Re: If you build a dam, what you do with water flow is now critical path.

That's a good article, thanks for sharing.

Dave
__________________
If supporting equal rights for all Americans makes me a racist then count me in and where do I get my bumper sticker!
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Let's Build a Rod Together Frank Whiton Fly Rod Building 108 05-25-2017 09:09 PM
How much for a pro build? colotrout General Discussion 14 03-27-2010 10:39 PM
For your review (please be critical) dorian.ducker Share Patterns 14 02-22-2010 10:37 PM
Cimarron River: Water flow below Eagle Nest Lake as of Monday was 4.9 cfs. There were Fish Bones The Daily Papers 0 11-20-2008 12:10 AM
ROSS new Flow reel Frank Whiton General Discussion 3 02-14-2008 03:39 PM














All times are GMT -5. The time now is 03:40 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2017, vBulletin Solutions, Inc.
Search Engine Optimisation provided by DragonByte SEO v2.0.40 (Pro) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
Feedback Buttons provided by Advanced Post Thanks / Like v3.6.3 (Lite) - vBulletin Mods & Addons Copyright © 2017 DragonByte Technologies Ltd.
2005-2017 The North American Fly Fishing Forum. All rights reserved.